Friday, February 24, 2012

RIDE

Ok here we go. Sunday we will meet at the Mash starting point. Junction of Ridge and Means Hollow Roads (and Canada Hollow and the AT). I know the trails but not sure how we should loop them. Oh yea there will be climbing involved. Ride time 9am


6 comments:

  1. So, is this straight up past long pine. Junction with Stillhouse Hollow, Forest and the AT?

    ReplyDelete
  2. well go past long pine at Y turn right on milsburn at next intersection go straight onto ridge ( up the mountain). go until you come to a left hand turn that is where we park for the mash. If you go up stillhouse when you get to the top at the intersection that is sandysod. Turn right, that is ridge road follow it. you'll come to the same turn. Hope that helps.

    ReplyDelete
  3. Anonymous9:02 PM

    Left, left, left, I'm lost...

    ReplyDelete
  4. Here is where we will park today.

    http://maps.google.com/maps/ms?msid=204446894475616181078.0004b9dccafd3ba811091&msa=0&ll=39.976923,-77.459579&spn=0.017824,0.031157

    ReplyDelete
  5. Thanks slow. I was hoping someone would put up a map

    ReplyDelete
  6. Nice ride today. We rode a lost trail today.
    Lots of bombing and lots of climbing.
    3100 climb
    3057 descend
    12.3 miles
    http://j.mp/A40SUT
    I think this link will show the map.

    ReplyDelete

Note: Only a member of this blog may post a comment.